How to Read a Carrier's Xactimate Estimate
A practical checklist for reviewing an insurance company's Xactimate estimate: price list, scope, quantities, labor, overhead and profit, and depreciation.
Most property insurance estimates in the United States are written in Xactimate. The format looks dense, but every carrier estimate can be reviewed the same way. Here is the order I use when I review one, whether for an owner, a contractor, counsel, or an appraisal.
1. Check the price list and date. The header shows the price list used, which is tied to a geographic area and a month. It should match the property's location and the date of loss (or the period when repairs are actually priced, depending on the policy and the claim). A price list for the wrong area or an old month can shift every line.
2. Read the sketch before the lines. Quantities flow from the sketch. Confirm room dimensions, wall heights, and which rooms are included. Missing closets, wrong ceiling heights, and rooms left off entirely are some of the most common sources of short quantities.
3. Compare scope to documented damage. For each room, ask whether the line items describe the repair the documented conditions actually require. Typical gaps include detaching and resetting items (cabinets, appliances, fixtures, trim), protection of finished surfaces, cleaning, debris removal and haul-off, and the full extent of materials affected behind the visible damage. The reverse also happens: items scoped where no damage was documented. Both directions matter.
4. Look at the units and quantities on each line. Square feet versus linear feet, each versus hours, and the quantity entered all deserve a second look. A line priced per linear foot with a square-foot quantity, or a quantity that does not match the sketch, is easy to miss.
5. Review labor and minimums. Small trade items often carry minimum charges for a trade to show up. Check whether those are included where a separate trade is genuinely needed. Where labor productivity is disputed, the analysis should follow how the work is actually performed on that building.
6. Check material grade and quality. The line description specifies a grade (standard, high grade, and so on). It should match what was actually installed. Photos and invoices help here.
7. Overhead and profit, tax, and depreciation. Confirm whether overhead and profit were applied, and on what basis. Check sales tax on materials. On the depreciation side, look at the age and life assigned to each item and whether depreciation was applied to labor as well as materials, then compare replacement cost (RCV) to actual cash value (ACV) under the policy terms.
8. Reconcile room by room. Put the two estimates side by side and work through them room by room, sorting each difference into scope, quantity, or price. That turns a large total difference into a short list of specific items, each of which can be checked against the building.
A careful review rarely produces a dramatic headline number. What it produces is a defensible list of documented differences, and that is what holds up with an adjuster, an appraisal panel, or opposing counsel.